ALWAYSE THE GO TO SOLUTION FOR AIR CARGO MOVEMENT

Commissioned by: Global Air Cargo handlers

Location: Colombia Airport

THE CHALLENGE

At many global airports, the unknown weight of bulky containers can make shipping difficult, inefficient and labour intensive.

One of the world’s leading logistics companies (operating in 220 countries) found that moving air cargo ULD’s can be particularly challenging.

Bogota Airport in Colombia was the perfect example of this challenge, and where Alwayse were consulted to assist.

THE SMART SOLUTION

Alwayse worked in partnership with local integrators to build and install a Ball Transfer Deck that enabled ULDs (max 7 tonnes) to be moved effortlessly and precisely. So successful was the solution, BTU 805 Series is now specified as the go to air cargo movement option.

Being trusted by one of the biggest names in the industry is a great testament to our smart solutions.

Alwayse the leader in Air Cargo movement.

AT A GLANCE

  • Makes light work of heavy loads.
  • One person can move up to 7 tonnes easily.
  • Precise 360° movement.
  • More efficient flow of air cargo.
  • Green solution – no power source required.

UNITS USED

loading an airplane
loading an airplane

SELECT YOUR BALL TRANSFER UNIT

Let us help you find the perfect Ball Transfer Unit to suit your application.

FIND OUT MORE

Success Stories

millenium bridge at night
SMART THINKING SAVED MILLENNIUM BRIDGE
Commissioned by: Millennium Bridge Location: London, UK THE CHALLENGE Shortly after its opening in 2000, the Millennium Footbridge was forced…
easy movement of air conditioning unit
WEATHERITE’S SMART MOVE TO IMPROVE ASSEMBLY
Commissioned by: Weatherite Group Location: West Midlands, UK THE CHALLENGE The Weatherite Group is the country’s leading HVAC (Heating, Ventilation…
WHEEL ALIGNMENT BALL TRANSFER TABLE
FORD LEAVES THE HEAVY MOVING TO US
Commissioned by: Ford Location: Worldwide THE CHALLENGE Ford Motor Company is one of the world’s most well-known brands with operations…
offshore pipeline
DEEP THINKING FOR OFFSHORE PROJECTS
Commissioned by: Global leader in offshore pipelines Location: Scotland THE CHALLENGE Alwayse worked with a global leader in the delivery…
oil rig in the middle of the sea at sunset
360° THINKING FOR OIL AND GAS EXPLORATION
Commissioned by: NOV Elmar Location: Scotland and Singapore THE CHALLENGE NOV Elmar is an oil and gas company, specialising in…
Akaypak moving steel plates effortlessly using Alwayse ball transfer units
EFFORTLESS MOVEMENT OF METAL
Commissioned by: Akyapak Location: Turkey THE CHALLENGE AKYAPAK drilling machines provide high quality manufacturing and application solutions to many industries.…
Atlas copco assembly line using Alwayse ball transfer units
MODULAR DESIGN TO HANDLE MATERIALS BETTER
Commissioned by: Atlas Copco Location: UK THE CHALLENGE Atlas Copco UK handles a huge range of innovative products across many…
national express movement solution installation
ALWAYSE PROVIDES TOTAL MOVEMENT SOLUTIONS
Commissioned by: National Express Location: UK THE CHALLENGE National Express Group is a leading transport provider delivering services across 11…
automated laser cutting of heavy duty tube
360° AUTOMATED MOVEMENT FOR HGG
Commissioned by: HGG Location: The Netherlands THE CHALLENGE HGG provides cutting-edge, fully automated 3D profiling machines that give fabricators the…
Glass printing machine
HIGH-TECH SOLUTION FOR HANDLING GLASS
Commissioned by: Dip-Tech Location: Israel THE CHALLENGE Dip-Tech is a global pioneer of digital ceramic glass printing solutions. Their machines…
loading a plane with cargo
ALWAYSE THE GO TO SOLUTION FOR AIR…
Commissioned by: Global Air Cargo handlers Location: Colombia Airport THE CHALLENGE At many global airports, the unknown weight of bulky…
OFF-ICE PUCKS
ALWAYSE A GOOD SPORT
Commissioned by: Stedol Location: Estonia THE CHALLENGE Demand for all weather pitches has reached an unprecedented high. Sports equipment manufacturer…
COMPARE BRIEF BUILDER CONTACT US